ERP deadline: December 31, 2026 — or 6 months from your RRA certification date, whichever comes first. $71,545/day penalty after that. ERP Package — $3,997 →
AWIA Emergency Response Plan

Your ERP Done. Certified.
In 48 hours.

Your RRA is filed. Your ERP needs to follow. Federal law requires ERP certification within 6 months of your RRA certification — the hard outer deadline for this recertification cycle is December 31, 2026. The earlier your RRA was certified, the sooner your ERP is due. KORVA delivers a complete, AWIA-compliant Emergency Response Plan in 48 hours. Certified. Defensible. Done well before your deadline.

⚡ 48-hour delivery AWIA §2013 compliant 4 certified deliverables $1,003 saved vs. bundle if RRA is current Dec 31, 2026 outer deadline
$71,545
per day civil penalty
SDWA §1433 · 40 CFR §19 statutory maximum
27,575+
utilities tracked
We verify your certification status before intake is complete
48 hrs
guaranteed delivery
From complete intake submission to final document delivery

48 hours to certified. Well before your ERP deadline.

Your ERP deadline is 6 months from your RRA certification date — with December 31, 2026 as the hard outer limit for this recertification cycle. KORVA delivers your complete ERP package in 48 hours, giving you weeks or months of runway to review, certify, and submit before that clock runs out.

NOW
Today You order
Pay $3,997. Routed to intake immediately — your system info, RRA status, operational context. About 20 minutes.
+48h
+48 Hours ERP delivered
All 4 deliverables in your inbox: ERP document, certification memo, EPA submission package, implementation checklist.
Days 3–12 Review and certify
Review with your team. KORVA is available for revisions. Submit certification to EPA. Compliant well before your ERP deadline.
Dec 31, 2026 Certified — deadline met
ERP certified and on file — well before the December 31 outer deadline. The $71,545/day penalty clock never starts. EPA enforcement avoided.
✓ KORVA ERP Package — 48-hour delivery
Order today, documents delivered in 48 hours, ample time to review and certify before your December 31 outer deadline (or earlier, if your RRA was certified mid-2026). Built to align with your existing RRA findings and certifiable under SDWA §1433. $3,997 flat.
Engineering firm — 6 to 16 weeks, $20,000+
Traditional engineering approach for ERP development runs 6–16 weeks and $20,000–$40,000+ for small-to-mid systems. Cuts deeply into your available window. KORVA delivers the same regulatory defensibility in 48 hours.

What your ERP covers — domain by domain.

AWIA §2013 requires your ERP to address emergency response protocols for each domain where your RRA identified significant hazards. KORVA builds each domain section against your specific operational context.

🏭

Physical & Infrastructure

Response protocols for physical attacks, tampering, equipment failure, and infrastructure damage. Includes isolation procedures, backup operations, and restoration sequences.

AWIA §2013(a)(2)(A) · Physical security hazards
💧

Water Quality & Contamination

Intentional and unintentional contamination response — notification protocols, sampling, public communication, isolation, and alternative supply activation.

AWIA §2013(a)(2)(B) · Malevolent acts
🔌

OT/SCADA & Cyber Incidents

Response procedures for cyberattacks on operational technology: detection, isolation, manual override, vendor notification, CISA reporting, and system restoration.

CISA AA23-335A · CIRCIA §681b
🌪️

Natural Hazards & Climate Events

Response protocols for extreme weather, flooding, drought, freezing, seismic events, and other natural hazard scenarios identified in the RRA hazard assessment.

AWIA §2013(a)(2)(C) · Natural hazards
👥

Staffing, Roles & Communications

Emergency staffing plan, decision authority matrix, internal escalation protocols, and external communication procedures — utilities, regulators, media, public.

AWIA §2013(b)(2) · Response team structure
🤝

Mutual Aid & Coordination

Coordination protocols with neighboring utilities, state emergency management, federal agencies (EPA, CISA, DHS), law enforcement, and regional water authorities.

AWIA §2013(b)(3) · Coordination agreements
Sample AWIA Emergency Response Plan document
SAMPLE DOCUMENT

What you receive in 48 hours.

A complete ERP package built to align with your RRA findings — not a generic template. AWIA §2013 compliant, certifiable, and ready for EPA submission.

  • Aligned with your existing RRA Your ERP is built to be internally consistent with the hazards identified in your RRA — satisfying the AWIA requirement that the two documents align. If you need both, the Bundle handles this automatically.
  • All 6 AWIA response domains addressed Physical security, contamination, cyber/OT incidents, natural hazards, staffing & communications, and mutual aid — each with specific, operational response protocols.
  • Certifiable under SDWA §1433 Your ERP is written to meet EPA certification requirements — including a certification memo formatted for EPA submission. Complete the certification yourself with our step-by-step checklist.
  • Operationally specific to your system Your intake data, population served, source type, system configuration, and operational context are built into every protocol. Not a fill-in-the-blank template.

4 deliverables. Everything you need to certify.

Every ERP Package includes the complete certification package — not just the document. You have everything to review, certify, and submit without a return trip.

1

Emergency Response Plan

The full ERP document — complete, AWIA §2013 compliant, covering all 6 required domains with response protocols specific to your utility type, population, source, and RRA findings.

2

Certification Memo

A formatted certification memorandum for EPA submission, affirming that the ERP has been reviewed and is consistent with the findings of the utility's most recent RRA.

3

EPA Submission Package

Complete EPA submission package with formatted cover letter, documentation checklist, and filing instructions for your primacy state — ready for submission without additional preparation.

4

Implementation Checklist

A 12-item post-certification checklist covering staff training, document distribution, annual review scheduling, and integration with mutual aid agreements — so the ERP doesn't just certify, it works.

KORVA vs. every other path to ERP compliance.

One table. Every option. Judge by timeline, cost, and whether it actually closes the gap before your deadline.

Factor KORVA ERP Package Engineering Firm DIY / Template
Price $3,997 $20,000 – $40,000+ $0 – $2,000 (template cost)
Delivery timeline ✓ 48 hours ✗ 6–16 weeks ⚠ Weeks to months
Closes gap before Dec 31? ✓ Yes — 48 hours ⚠ Possible, but 6–16 weeks ⚠ Only if you write it correctly
What you provide 20-minute intake form Months of data collection, site visits, interviews Everything — template fills nothing for you
RRA alignment ✓ Built in ✓ Yes — if RRA is current ⚠ You must align manually
Regulatory defensibility ✓ AWIA §2013 / SDWA §1433 ✓ Yes — at significant cost ⚠ Only if you write it correctly
Certification package included ✓ Memo + submission package ⚠ Varies by firm ✗ You prepare separately
Penalty avoidance confidence ✓ High — certified well before deadline ⚠ Possible, at significant cost and time ⚠ Depends on document quality
Our Database

We know what your ERP needs to address before you submit your intake.

KORVA Sentinel maintains 27,575+ water utility records sourced from EPA SDWIS and AWIA federal certification data. When you submit your intake, we already have your PWSID, population tier, source type, violation history, and AWIA certification status for both your RRA and ERP. Your intake adds the operational context public records can't tell us — producing an ERP with the specificity of an on-site engagement at a fraction of the timeline.

27,575+
Water utility records in our compliance database, sourced from EPA SDWIS and federal AWIA certification data
~3,200
Systems with current RRA on file but ERP uncertified or outdated for this recertification cycle
>70%
Of systems EPA inspected found in active violation — EPA Enforcement Alert, July 2025

From order to certified ERP in 48 hours.

Four steps. 20 minutes of your time on intake. Full ERP package in your inbox within 48 hours of complete intake submission.

1

Order & Intake

Pay $3,997 and complete the intake form — about 20 minutes. Your utility's PWSID, RRA status, system configuration, operational context, and known hazard areas. The more complete, the stronger your ERP.

2

ERP Build

KORVA Sentinel builds your Emergency Response Plan against your intake data, EPA record, and your RRA findings. All 6 required AWIA domains addressed with protocols specific to your system.

3

Delivery — 48 Hours

All 4 deliverables arrive in your inbox: complete ERP document, certification memo, EPA submission package, and implementation checklist. Review and request any revisions before certifying.

4

Certify & Submit

Follow the submission checklist to certify your ERP with EPA. KORVA remains available for any revisions through your certification deadline. Once certified, your compliance obligation for this cycle is complete.

The fastest path to closing your ERP compliance gap.

Your ERP deadline is 6 months from your RRA certification date — December 31, 2026 at the latest. Miss it, and civil penalties up to $71,545/day can apply. KORVA closes the gap in 48 hours. No site visits. No multi-week engagements. No five-figure engineering contracts. Just the document you need, built right, delivered before you're exposed.

48-hour delivery — guaranteed From complete intake submission to final ERP package delivery. Documents in hand within 2 days, giving you ample time to review, certify, and submit well before your December 31 deadline.
Built to align with your RRA AWIA requires your ERP to be consistent with the findings of your RRA. KORVA builds that alignment directly into your ERP — so the two documents hold up to EPA scrutiny as a coherent package.
Need both? The Bundle saves $1,497 If your RRA is also missing or outdated, the AWIA Recertification Bundle ($5,497) builds both documents from one intake and delivers them together — for $2,497 less than buying them separately.

Need a Professional Engineer seal?

Some utilities — particularly those subject to state PE requirements or serving as a procurement reference — need their ERP reviewed and sealed by a licensed Professional Engineer. KORVA offers PE-sealed review as a separate engagement.

Licensed PE review of your complete ERP package
Seal and signature on all applicable sections
PE stamp recognized for state procurement and insurance requirements
Available as an add-on to the ERP Package or Bundle
$15,000
PE-sealed ERP review · Contact for availability

Contact for PE Seal →

Questions we hear every time.

Your ERP. In 48 hours.

One intake form. 20 minutes. Your ERP — built, certified, and done. Federal law required this within 6 months of your RRA certification. Don't let the exposure compound another day.

The KORVA ERP Package delivers an AI-assisted Emergency Response Plan built from your intake data, EPA records, and KORVA Sentinel's 27,575-record compliance database. It is not legal advice. The ERP document is designed to meet AWIA §2013 and SDWA §1433 certification requirements; however, EPA acceptance, penalty avoidance, and regulatory outcomes cannot be guaranteed and depend on your utility's timely certification, accurate intake submission, and compliance with applicable primacy state requirements. Utilities should verify specific obligations with EPA, CISA, state primacy agencies, and qualified legal counsel before final compliance action. Civil penalty figures reflect the 40 CFR §19 statutory maximum; actual enforcement is at EPA discretion. PE-sealed review is a separate engagement — contact sentinel@korvasystems.com for availability and pricing.